CJCSM 5123.01 Manual for the Joint Requirements Oversight Council and the Joint Force Requirements Process (15 January 2026)

The updated guidance fundamentally restructures the Joint Requirements process by eliminating JROC validation of Service- and component-level requirements and refocusing the JROC on Joint Force Development (JFD), Joint Capability Integration (JCI), and Combatant Command (CCMD) requirements, aligned to Joint Operating Plans (JOPs) and informed by Capability Portfolio Management (CPM). Based on initial review, these changes are expected to have major impacts across the requirements portion of the MPM.

DoDM 5010.12 Acquisition and Management of Contractor-Prepared Data (21 November 2025)

New DoD Manual 5010.12 — “Acquisition and Management of Contractor-Prepared Data”: Official DoD policy (effective Nov 21 2025) replacing the 1993 5010.12-M. It standardizes procedures and assigns responsibilities across contract phases — solicitation through post-award — for acquiring, inspecting, accepting, managing, and protecting contractor-provided technical and software data under FAR/DFARS and other agreements. Reference: 1.5.1.1.6.6.3 Manage Submitted Data

DoDI 5000.35 Defense Acquisition Regulation System (17 September 2025)

DoDI 5000.35 – Defense Scientific and Technical Information ProgramEstablishes policy and responsibilities for managing DoD scientific and technical information to ensure effective collection, protection, dissemination, and accessibility supporting research, development, acquisition, and operational decision-making across the Department of Defense.

OSD (R and E) Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide (May 2023 Incorporating Change 1, 1 October 2024)

Technical guidance for the Integrated Master Plan and Integrated Master Schedule (IMP/IMS) Preparation and Use Guide (May 2023, Change 1 Oct 2024): outlines event-based framework, development and implementation of IMP/IMS tools, their integration with WBS/SOW/EVM, and relevance across acquisition life-cycles. Referenced on 1.4.17.3 Conduct Independent Logistics Assessment